GPS Tracker Magnetic Real-Time Location & Motion Alerts

€39,99

Auf Lager und versandbereit

Kostenloser Versand in Deutschland und in die USA

30 Tage Rückgaberecht

Title: Standard title
LIMITED STOCK · Only a few left in stock

This product will be available for sale in 2 weeks, but you can pre-order now to receive 10% discount!

American Express Apple Pay Google Pay PayPal Mastercard Maestro Visa

Get 10% OFF your order with code

VOLT10

Tap the code to copy — apply at checkout

GPS Tracker Magnetic Real-Time Location & Motion Alerts

€39,99

€39,99

Choose option
Title: Standard title
  • Standard title

Stop losing track of the things that matter most

Locate valuables and monitor movement remotely — real-time GPS updates, instant motion alerts, and audio monitoring, with magnetic attachment and no installation.

Why Is This Perfect for You?

✔ Real-time location and movement alerts: Receive real-time location updates on a smartphone and get notified as soon as the tracked item moves. This helps keep tabs on vehicles, luggage, and other valuables and provides a prompt alert when something is disturbed.

✔ Magnetic attachment with no installation: Attach it to a metal surface in seconds using the built-in magnet. No drilling or complicated installation is needed, making it simple to position and move as needed.

✔ Remote audio monitoring: Use the built-in audio monitoring function remotely for an additional way to check what is happening near the tracked item. The compact ABS plastic housing measures 1.62 in by 0.54 in and operates from -4°F to 158°F.

Specifications

Material: ABS plastic

Dimensions: 1.62 in × 0.54 in

Frequency: 850, 900, 1800, 1900 MHz

Power supply: 3 V lithium button cell battery

Kundenservice

Haben Sie Fragen oder benötigen Sie Hilfe? Unser Team steht Ihnen gerne zur Verfügung.
Wir sind werktags von 09:00 bis 17:00 Uhr (CET) erreichbar.

📧 E-Mail: info@voltyx.de
📞 Telefon: +447888395753

Lieferzeit

Aktuell beträgt unsere Bearbeitungszeit 1–5 Werktage, bevor die Bestellung versendet wird. Nach dem Versand dauert die Lieferung in der Regel 1–5 Werktage innerhalb Deutschlands (DHL) sowie in die USA (USPS), abhängig vom Versanddienstleister

Rückgabe

Bei uns haben Sie ein 30-tägiges Rückgaberecht – gültig ab dem Tag, an dem Sie die Ware erhalten. Möchten Sie einen Artikel zurücksenden, kontaktieren Sie uns bitte unter:

📧 E-Mail: info@voltyx.de